Conceptual image

Future resilience / agentic AI / cryptographic transition

Control the next action.
Prepare for what changes.

OSYRA’s resilience architecture connects agent authority, limited operation during outages and accountable recovery. Its longer-term roadmap addresses the continuity of verification as cryptographic systems evolve.

Action control · Recovery architecture · Cryptographic transition roadmap

See the practical retry and recovery example

Agent-driven operations

Autonomy expands.
Authority still has a scope.

An agent can retain technical access after the conditions supporting a particular action have changed. The relevant question is whether the current selected basis still supports this action now.

Later actions

Does the earlier approval still apply to the current client, purpose, site and operating conditions?

Persistent work

What keeps an existing work order connected to the credentials and conditions supporting it?

Later review

Can a reviewer establish the decision-time basis rather than depend on a later-generated explanation?

Action authority complements model safeguards, identity security and human oversight, with a distinct role in controlling the consequence of an agent’s next step.

Two different disruption questions

Missing verification.
Uncertain execution.

Credential fallback

What is permitted
while a source is unavailable?

Use only institution-permitted alternative checks and task limits. Otherwise defer or escalate. Unavailable revocation information is not unrestricted authority.

Recovery

What must be established
before trying again?

Reconstruct and reconcile the relevant state before corrective or superseding action. A service returning does not establish whether the earlier action occurred.

Outage handling uses permitted alternatives when verification is unavailable. Execution recovery requires reconciliation of the prior effect before a retry.

Quantum-transition risk

The record may outlast
the cryptography.

Future cryptographically relevant quantum computers threaten traditional public-key mechanisms. Preparation concerns both confidential information and the authentication and signatures used to establish trust.

Public risk context. ASD guidance · NIST standards

Confidentiality

Information collected today may face future decryption risk where vulnerable cryptography protects long-lived sensitive data. That makes data value, retention and migration planning relevant now.

Authenticity and verification

Credentials and decision records can rely on signatures and verification systems. Their transition requires more than replacing a product label or assuming old evidence will remain verifiable.

Cryptographic transition is on the development roadmap. The next milestone is implementation-specific evaluation of migration, security, performance and the continued interpretation of historical records. The organisation retains responsibility for its wider cryptographic migration.

Related context. NIST on achieving crypto agility

Conceptual image

Planning horizons

Plan the transition.
Preserve what matters.

Official migration milestones differ by jurisdiction. These targets shape current inventory, supplier and investment decisions. They do not predict when a practical quantum attack will arrive.

Australia / ASD guidance

  1. 2026Refine the transition plan by year-end.
  2. 2028Begin transition, prioritising critical systems and data.
  3. 2030Complete the recommended transition.
Read the Australian guidance

United Kingdom / NCSC guidance

  1. 2028Complete discovery and initial planning.
  2. 2031Complete highest-priority migration activities.
  3. 2035Complete migration of systems, services and products.
Read the UK guidance

For new systems expected to operate beyond 2030, ASD’s cryptography guidance also makes post-quantum support a procurement consideration. Assess keys, credentials, signatures and retained records across the whole system, including dependencies outside OSYRA. Read ASD’s cryptography guidance.

Public context reviewed 21 October 2026. Apply the guidance relevant to the jurisdiction, system and risk. OSYRA’s implementation and evidence are described separately on the development page.

A useful next test

What must stay
under control?

For a defined deployment, identify its authoritative sources, action routes, retained evidence, operating dependencies and cryptographic assumptions.

Evaluate the selected control through agreed change and failure conditions. Sovereign deployment and cryptographic migration each have their own acceptance criteria and test scope.

Explore sovereign deployment questionsRead the evidence status

Start with a practical requirement

What must remain governable as your systems change?

Bring one workflow, one changing condition and the outcome that would make a difference.

Discuss a workflow